Guides
Workflow
The five states, moving between them, archiving and deleting.
Jot has five states. Each one records what you intend, not whether some process is running.
| State | Meaning | Shown on the board |
|---|---|---|
inbox |
Captured, not started | Yes |
in_progress |
Being worked on, including review and acceptance | Yes |
on_hold |
Deferred, or waiting on something external | Yes |
done |
Finished | Sidebar only |
archived |
Not going to happen; still searchable and restorable | No |
Changing state
jot mv 42 in_progress
jot mv 42 on_hold
jot mv 42 done
jot mv 42 inbox
In the app, drag a card to another column. Any state can move to any other; every transition is recorded with its time and actor in the state log.
Archive and restore
jot rm 42 # archive
jot mv 42 inbox # restore
Archiving keeps the requirement and its Markdown file. Archived requirements stay out of the board and default listings; find them with jot ls --all --state archived, the app’s search, or Settings → Archived, which can also restore them.
Permanent deletion
jot purge 42 # asks for confirmation
jot purge 42 43 --yes
purge only accepts archived requirements. It removes the database rows, tags, links, state history and the Markdown file. It cannot be undone; prefer archiving.
In the app, right-click a card or row and choose Delete…. After you confirm, the app archives the requirement if needed and then purges it.
A typical week
- Capture freely during the day; everything lands in Inbox.
- Once or twice a week, open the inbox: triage projects, tag the release, archive what no longer matters.
- Move what you start to In Progress; park blocked items in On Hold with a note in the body saying what they wait for.
- Mark items Done when they ship;
jot ls --tag v1.2 --allshows the whole release.
Priority
jot set 42 --priority 1 # high
jot set 42 --priority 0 # normal
High-priority requirements are listed first within each state by jot ls and in JSON results. Priority does not affect states, and the app does not display it.